Sporistics
Installation Lamentation / Analysis
By JPHeald
11/26/2024 - 03:46:49
Type: Puzzle adventure
Rating: 6 (Good)
Basic info
Intro message:
Are you ready to work late tonight? The job for this evening calls for the replacement of the existing Carbon-based barrier with an Aluminum-based perimeter barrier. Let's do this!
Are you ready to work late tonight? The job for this evening calls for the replacement of the existing Carbon-based barrier with an Aluminum-based perimeter barrier. Let's do this!
Win message:
Good job! Despite the limited visibility and lack of sleep, the barrier came out looking nice. The subcontractor, Yill says he will contact you with more work coming soon!
Good job! Despite the limited visibility and lack of sleep, the barrier came out looking nice. The subcontractor, Yill says he will contact you with more work coming soon!
Lose message:
We've dug ourselves into an early grave with this job! Looks like we'll be coming back tomorrow...
We've dug ourselves into an early grave with this job! Looks like we'll be coming back tomorrow...
Acts
ACT 1 : Talk to Yill.
Before we get to work, talk to the subcontractor, Yill.
Before we get to work, talk to the subcontractor, Yill.
ACT 2 : Tear it Out.
Grab the Power Tool and take out the old, existing Carbon-based barrier. When you are finished tearing out the expired barrier, Talk to Yill
Grab the Power Tool and take out the old, existing Carbon-based barrier. When you are finished tearing out the expired barrier, Talk to Yill
ACT 3 : Dig the Holes.
Grab the Diggers and bring them to the Flag Stake to dig a Post Hole. When you are done digging the holes, Talk to Yill.
Grab the Diggers and bring them to the Flag Stake to dig a Post Hole. When you are done digging the holes, Talk to Yill.
ACT 4 : Set the Posts.
Grab an Aluminum Post off of the Trailer and bring it to a Post Hole to set the post. When you are done setting the posts, Talk to Yill.
Grab an Aluminum Post off of the Trailer and bring it to a Post Hole to set the post. When you are done setting the posts, Talk to Yill.
ACT 5 : Pour the Rockcrete.
Grab a Bag of Rockcrete and bring it to the Post to pour the Rockcrete. When you are done pouring the Rockcrete, Talk to Yill.
Grab a Bag of Rockcrete and bring it to the Post to pour the Rockcrete. When you are done pouring the Rockcrete, Talk to Yill.
ACT 6 : Screw the Panels.
Grab some Selftap Screws and bring them to the Aluminum Barrier Panel to screw the panel. When you are done screwing the panels, Talk to Yill.
Grab some Selftap Screws and bring them to the Aluminum Barrier Panel to screw the panel. When you are done screwing the panels, Talk to Yill.
ACT 7 : Clean Up.
Pick up the empty Rockcrete bags and smoothen out the dirt around the posts. Grab the Pallets and any other tools you see laying around.
Pick up the empty Rockcrete bags and smoothen out the dirt around the posts. Grab the Pallets and any other tools you see laying around.
ACT 8 : Talk to Yill.
Job complete! Get settled with the subcontractor and head on outta here!
Job complete! Get settled with the subcontractor and head on outta here!
Contact us at